Natty Boh Tower in Baltimore, MD
Historic Renovation, Adaptive Re-Use
Construction Cost: $100 Million
Size: 6 Buildings , 1-12 Stories
Completion Date: 2008
This PUD encompasses six existing buildings of various sizes ranging from a one-story bottle shop warehouse, to a twelve-story beer manufacturing facility converted to storage, office space, and condos. The other buildings have been converted to office space. The conversion of this site from manufacturing to multi-use, engaged our structural design for signs, elevators, stairs, underground rooms, glass roof top spaces, in fills, new openings, and analysis of existing structural loads.